top of page


We Joined Metametrik #309: "Digital Memory in Architecture: DATA
Digital Memory in Architecture: DATA

TAPA Parametric Architecture
Aug 271 min read


Cloud BIM I TEAM'S DO NOT NEED TO BE IN THE SAME OFFICE.
1-" THE OFFICE IS NO LONGER A COORDINATE '' Project management is a challenging process for minimizing risk and providing a clear framework alignment in large-scale construction projects. From past to present, design coordination based on visuals and manual control mechanism of technical drawings. “Design coordination meetings conducted to address these issues can cost between USD 8000 and USD 23,000 per session” (Mehrbod, Staub-French and Tory, 2020, p. 25-36) The project r

TAPA Parametric Architecture
Jun 110 min read
bottom of page